![](https://images.squarespace-cdn.com/content/v1/66601c5240d1fd1962e4ca91/fb274f43-5b5f-496a-890e-ca69d9f19e25/20+Cecil+St+floorplate+brochure-04a.png)
Specifications
Raft foundation with reinforced concrete structure
STRUCTURE
External walls: Concrete and/or masonry walls and/or pre-cast and/or aluminium & glazing wall cladding
Internal walls: Concrete and/or masonry and/or partition wall
WALLS
Reinforced concrete flat roof with waterproofing system with or without insulation
ROOF
All ceiling with skim coat unless otherwise stated
Ceiling board with painted finishes to corridors, main lobby and lift lobby
CEILING
Wall: Masonry and/or dry partition wall plastered and paint. Imported tiles to washroom, lift lobby and corridors. Plastered and paint to basement wall
Floor: Cement rendered finishes to all units unless otherwise stated. Imported tiles to washroom, lift lobby and corridors. Epoxy paint finish to basement carpark and driveway
FINISHES
Office unit: Window and/or casement window with aluminium frame (where applicable)
Double glazed glass and/or double glazed safety glass (where applicable)
WINDOWS
Office unit: Glass and/or timber doors and PSB’s approved fire-rated doors where applicable
DOORS
Office unit: Imported good quality ironmongery
IRONMONGERY
Office unit: Imported good quality sanitary wares, fittings and accessories (to applicable units only)
SANITARY FITTINGS
415V three phase isolator for office units
ELECTRICAL INSTALLATION
LIFTS
Lift to all floors
Raft foundation with reinforced concrete structure
AIR -CONDITIONING SYSTEM AND MECHANICAL VENTILATION
TELECOMMUNICATION SERVICES
Provision of cable network
Lightning Protection System shall be provided in accordance with Singapore Standard 555: 2010
LIGHTNING PROTECTION
Office unit: Waterproofing to unit washrooms
Common areas: Waterproofing
WATERPROOFING
Stone paving to designated 1st storey areas of driveway
DRIVEWAY
Card access control system to selected locations
Proximity transponder for vehicular entry at entrances CCTV, surveillance cameras at strategic locations
SECURITY SYSTEM
Office unit (3rd to 28th storey): 4.0 kN / m2
FLOOR LOADING
Contact Us.
Interested in Plus, 20 Cecil Street? Fill out some info and we will be in touch shortly!
We can't wait to hear from you!